LIRR power problems
Multiple Long Island Rail Road trains were delayed and canceled during the Tuesday morning rush due to an Amtrak third rail power issue in the East River tunnel, according to the MTA. Two LIRR trains were stuck underground for more than an hour as a result of the power loss. Amtrak said it was trying to determine the cause of the malfunction.